Design, Evaluate and Scale Project

SAFR: Safe and Affordable Fluoride Removal

Status: Completed M.Eng project (Sept 2019 - Dec 2019)

​

Objective:

200 million people live above the WHO acceptable level (1.5 mg/L) of fluoride in their drinking water, resulting in crippling dental and skeletal fluorosis. One third of fluorosis occurs in India where an affordable technology does not exists yet. SAFR aims to develop affordable, effective, and novel bauxite filtration technology and prepare a business model to scale the technology to reduce the prevalence of fluorosis for rural communities in India.

​

Project Work:

​​

  • Prepared customer/user needs assessment plan. Identified target audience, type of information to collect, how to collect information and how to document the research.

  • Performed Stakeholder analysis and competitor analysis.

  • Designed and carried out the survey to collect quantitative data on user's water usage habits and willingness to buy/use a water filter.

  • Conducted 20 1:1 interviews with the stakeholders like researchers, users from India, potential investors and product design experts and gained insights on filtration technology, home-based vs centralized water filtration system and desirable product features.

  • Analyzed user research and compiled all important insights into Affinity diagram. Identified key product requirements.

  • Created user journey map.

  • Generated 50 Concept ideas, clustered them and reduced to 2 concepts using brainstorming, concept combining, voting and weighted matrix.

  • Developed prototype testing plan that included what are we testing, things needed for implementation, Qualitative/Quantitative metrics assessment, Focus group and testing steps.

  • Created a Business Model Canvas for SAFR awareness and adoption.

  • Performed rigorous impact evaluation based on theory of change.

  • I owned the additional responsibility of project management and documentation.​

​

​

project plan.PNG
Project Plan
stakeholder.PNG
Stakeholder Analysis
IMG_20191117_190940651_HDR_2.jpg
User Research and
Needs Assessment Insights
Affinity Diagram
Concept Generation
and
Clustering
Half Sheets
IMG_20191003_104209442_HDR.jpg
Design Concept1.png
Concept 1 (Home-Based System)
Design Concept.png
Concept 2 (Centralized System)
Business Model Canvas.PNG
Business Model Canvas
Theory of change SAFR.PNG
Theory of Change
  • LinkedIn Social Icon
  • Facebook Social Icon
  • Instagram

Connect on social media!

Created By Abhishek Bhagwat. Last Update on 30 May 2020.